Trade Haven Hub - Investing and Stock News
  • Investment Tips
  • Trade Tips
  • Crypto News
  • Economy News
  • Stock Market
  • Investment Tips
  • Trade Tips
  • Crypto News
  • Economy News
  • Stock Market
No Result
View All Result
Trade Haven Hub - Investing and Stock News
No Result
View All Result
Home Trade Tips

Ore Reserve Quadruples for Rhyolite Ridge Project; Reaffirms Robust Project Economics

admin by admin
June 2, 2025
in Trade Tips
0
Ore Reserve Quadruples for Rhyolite Ridge Project; Reaffirms Robust Project Economics
0
SHARES
0
VIEWS
Share on FacebookShare on Twitter

Ioneer Ltd (ASX: INR, Nasdaq: IONR) (Ioneer) is pleased to announce a 308% upgrade to the Ore Reserve estimate for its 100%-owned Rhyolite Ridge Lithium-Boron Project (‘Rhyolite Ridge’ or the ‘Project’) in Nevada, USA, alongside updated Project economics.

  • Rhyolite Ridge Ore Reserve more than quadrupled from 60 million tonnes in 2020 to 247 million tonnes, delivering a mine life of 95 years
  • Ore Reserve now contains a total of 1.92 Mt of lithium carbonate equivalent and 7.68 Mt of boric acid equivalent
  • Underpinning plans for a large, long-life, low-cost expandable operation, producing lithium carbonate, boric acid and then battery-grade lithium hydroxide
  • Stable co-product – boric acid accounts for an average 25% of annual revenue in the first 25 years; helping ensure positive EBITDA at low lithium prices and EBITDA margin of 65.7% based on average production over first 25 years
  • All-in sustaining cash cost of US$5,745 per metric tonne lithium carbonate equivalent places the Rhyolite Ridge Project in the bottom of the global lithium cost curve
  • Compelling Project economics with an after-tax NPV of US$1.367 billion, and an unlevered, after-tax internal rate of return (IRR) of 14.5%

The Ore Reserve has increased by 186.6 million tonnes (Mt) and approximately 48% of the Mineral Resource has been converted into Reserve, now estimated at:

  • 246.6 Mt at 1,464 ppm lithium and 5,444 ppm boron
  • Containing 1.92 Mt of Lithium Carbonate Equivalent (LCE) and 7.68 Mt of Boric Acid Equivalent (BAE)

“Today’s updated Reserve and Mine Plan reinforces the importance of Rhyolite Ridge’s remarkable mineralogy. Our Ore Reserve estimate of 247 Mt containing a total of 1.92 Mt LCE and 7.68 Mt BAE make it the largest lithium-boron Reserve in the world,” said Bernard Rowe, Managing Director, Ioneer. “It allows Ioneer to match prevailing market conditions and blend or prioritise ore to produce a valuable boric acid co- product, whose market is uncorrelated with the Project’s primary lithium product. No other lithium project offers this level of flexibility and economic advantage. In periods of low cycle lithium pricing, like today, we plan to prioritize the high-boron ore production to optimize the relative proportion of total revenue derived from boric acid.”

By prioritising High-Boron (Hi-B) ore in the first 25 years of production, the Project is poised to produce an average of ~19,200 tonnes per annum (tpa) of LCE, and 116,400 tpa of boric acid (see Table 1).

The updated Ore Reserve estimate, 95-year mine plan for stage one operations, and Project economics reaffirms Rhyolite Ridge as a highly attractive global Project to produce lithium carbonate, lithium hydroxide and boric acid. The updated findings position Ioneer, on an LCE basis, in the lowest cost quartile for lithium production globally with an estimated all-in sustaining cash cost to produce battery grade lithium hydroxide of US$5,745 and a cash cost of C1 $3,858 per tonne net of expected boric acid revenue in the first 25 years.

The Project has a stable overall operating cost structure to produce lithium carbonate and battery grade lithium hydroxide due to the scale and reliability of its boric acid credit. Boron remains one of the most stable natural resource commodities over many decades.

Ioneer has refined Project plans over the past four years and updates now include an Association for the Advancement of Cost Engineering (AACE) Class 2 capital cost estimate (-10%, +15%) with approximately 70% of the Project’s engineering complete. As a result of this and other engineering work including RAM analysis and detailed engineering design, Ioneer has adopted a more conservative approach to plant availability, equipment downtime and maintenance strategies. While this approach reduces bottom line economics, the Company believes it is appropriate for a Project of this type and scale.

The Company now estimates total capital expenditure to complete the Project will be US$1,667.9 million, including a 10% contingency.

Click here for the full ASX Release

This post appeared first on investingnews.com
Previous Post

Metaplanet Adds 1,088 More Bitcoin — Total Portfolio Climbs to 8,888 BTC

Next Post

Blue Lagoon’s Dome Mountain Joins BC’s Select List of Permitted Projects

Next Post
Blue Lagoon’s Dome Mountain Joins BC’s Select List of Permitted Projects

Blue Lagoon’s Dome Mountain Joins BC’s Select List of Permitted Projects

  • Trending
  • Comments
  • Latest
Quantum Computing: its Evolution and its Potential Future

Quantum Computing: its Evolution and its Potential Future

March 20, 2025
Buy Bitcoin Under $100K Before The Next Bull Run

Buy Bitcoin Under $100K Before The Next Bull Run

April 22, 2025
Air Direct Capture – Reducing CO2 from the Atmosphere

Air Direct Capture – Reducing CO2 from the Atmosphere

March 20, 2025
Kraken Rolls Out Commission-Free Stock Trading

Kraken Rolls Out Commission-Free Stock Trading

April 21, 2025
Platinum Price Surges to 11 Year High, Breaks US$1,400

Platinum Price Surges to 11 Year High, Breaks US$1,400

0
Quantum Computing: its Evolution and its Potential Future

Quantum Computing: its Evolution and its Potential Future

0
Quantum Computing: its Evolution and its Potential Future

Quantum Computing: its Evolution and its Potential Future

0
Air Direct Capture – Reducing CO2 from the Atmosphere

Air Direct Capture – Reducing CO2 from the Atmosphere

0
Platinum Price Surges to 11 Year High, Breaks US$1,400

Platinum Price Surges to 11 Year High, Breaks US$1,400

June 27, 2025
Market Pain, Strategic Gain: Pilbara Minerals’ Dale Henderson on Today’s Lithium Paradox

Market Pain, Strategic Gain: Pilbara Minerals’ Dale Henderson on Today’s Lithium Paradox

June 27, 2025
Leading AI Claude Predicts the Price of XRP, Pi Coin and Bitcoin Cash by the End of 2025

Leading AI Claude Predicts the Price of XRP, Pi Coin and Bitcoin Cash by the End of 2025

June 27, 2025
South Korean Lawmaker Proposes ETF Bill to Include Virtual Assets

South Korean Lawmaker Proposes ETF Bill to Include Virtual Assets

June 27, 2025

    Stay updated with the latest news, exclusive offers, and special promotions. Sign up now and be the first to know! As a member, you'll receive curated content, insider tips, and invitations to exclusive events. Don't miss out on being part of something special.


    By opting in you agree to receive emails from us and our affiliates. Your information is secure and your privacy is protected.

    Recent News

    Platinum Price Surges to 11 Year High, Breaks US$1,400

    Platinum Price Surges to 11 Year High, Breaks US$1,400

    June 27, 2025
    Market Pain, Strategic Gain: Pilbara Minerals’ Dale Henderson on Today’s Lithium Paradox

    Market Pain, Strategic Gain: Pilbara Minerals’ Dale Henderson on Today’s Lithium Paradox

    June 27, 2025
    Leading AI Claude Predicts the Price of XRP, Pi Coin and Bitcoin Cash by the End of 2025

    Leading AI Claude Predicts the Price of XRP, Pi Coin and Bitcoin Cash by the End of 2025

    June 27, 2025
    South Korean Lawmaker Proposes ETF Bill to Include Virtual Assets

    South Korean Lawmaker Proposes ETF Bill to Include Virtual Assets

    June 27, 2025
    • About us
    • Contact us
    • Privacy Policy
    • Terms & Conditions

    Copyright © 2025 tradehavenhub.com | All Rights Reserved

    No Result
    View All Result
    • Investment Tips
    • Trade Tips
    • Crypto News
    • Economy News
    • Stock Market

    Copyright © 2025 tradehavenhub.com | All Rights Reserved