Trade Haven Hub - Investing and Stock News
  • Investment Tips
  • Trade Tips
  • Crypto News
  • Economy News
  • Stock Market
  • Investment Tips
  • Trade Tips
  • Crypto News
  • Economy News
  • Stock Market
No Result
View All Result
Trade Haven Hub - Investing and Stock News
No Result
View All Result
Home Trade Tips

TomaGold Intercepts 6.68% ZnEq (1.57 g/t AuEq) over 48.05 Metres, including 39.03% ZnEq (9.15 g/t AuEq) over 2.90 Metres at Berrigan Mine and Identifies a Major Hydrothermal Footprint

admin by admin
December 22, 2025
in Trade Tips
0
TomaGold Intercepts 6.68% ZnEq (1.57 g/t AuEq) over 48.05 Metres, including 39.03% ZnEq (9.15 g/t AuEq) over 2.90 Metres at Berrigan Mine and Identifies a Major Hydrothermal Footprint
0
SHARES
0
VIEWS
Share on FacebookShare on Twitter

TOMAGOLD CORPORATION (TSXV: LOT; OTCPK: TOGOF) (“TomaGold” or the “Company”) is very pleased to announce the initial assay results from drill holes TOM-25-009 and TOM-25-010 at its Berrigan Mine project located in the Chibougamau mining camp, in Québec. These are the first two of seven holes for a total of 3,098 metres at Berrigan Mine, with the objective of testing the historical mineralized structure and opening new potential mineralization at depth. The results confirm the presence of high-grade gold-bearing polymetallic vein systems within an extensive mineralized envelope hosted in ultramafic rocks.

Highlights

  • Main High-Grade Intersections:
    • Hole TOM-25-009 (from 156.70 m): 6.68% ZnEq (1.57 g/t AuEq) over 48.05 metres, including 39.03% ZnEq (9.15 g/t AuEq) over 2.90 metres and 21.86% ZnEq (5.12 g/t AuEq) over 5.40 metres.
    • Hole TOM-25-009 (from 244.50 m): 5.44% ZnEq (1.27 g/t AuEq) over 15.20 metres, including 25.15% ZnEq (5.85 g/t AuEq) over 2.55 metres.
    • Hole TOM-25-010 (from 130.70 m): 2.67% ZnEq (0.62 g/t AuEq) over 48.30 metres, including 12.87% ZnEq (3.00 g/t AuEq) over 6.25 metres.
  • Assay results are pending for five drill holes targeting the lateral and depth extensions of the known mineralized envelope (TOM-25-011 to TOM-25-015).
  • Hydrothermal footprint: Identification of a significant hydrothermal signature at the roof of the main mineralization, providing valuable exploration guidance for potential extensions.
  • Exploration ongoing: A Borehole EM survey is currently underway on the ground to identify new targets.

Figure 1: Berrigan Mine Drill Hole Location Map

Figure 2: Longitudinal Section of the Berrigan Mine Known Mineralized Envelope and Completed Drill Holes (excluding TOM-25-011 and TOM-25-012)

David Grondin, CEO of TomaGold, commented: “These initial results are truly outstanding, most notably the 39% ZnEq intersection in hole TOM-25-009. The confirmation of a hydrothermal footprint overlying the main mineralized zones significantly reinforces our geological understanding of the Berrigan Mine project. With the EM survey currently underway and extension drilling results expected in January, we look forward to defining the full scale and continuity of the mineralized envelope.”

Jean Lafleur, P.Geo., VP Exploration at TomaGold, added: “TomaGold is currently advancing an all-encompassing litho-structural and geophysical compilation, synthesis and interpretation for its Chibougamau mining camp projects, incorporating AI modeling with Windfall Geotek’s proprietary system. We’ve also completed additional geophysical work to refine both gold and polymetallic targeting for the upcoming winter 2026 exploration campaign. This approach has already yielded new targets, which are currently being tested through diamond drilling. The latest drilling results at Berrigan Mine offer a glimpse into the exploration potential of some of these targets.”

Mineralization at Berrigan Mine is primarily associated with carbonatized ultramafic rocks. Analysis of visually non-mineralized samples, including intervals initially excluded from sampling, has identified low-grade halos associated with quartz-carbonate stockwork that increase the potential volume of the mineralized envelope. A borehole EM survey is currently being conducted on holes from this campaign to guide future deep drilling. To ensure a comprehensive understanding of the system, the team proactively analyzed previously unsampled sections to ensure that no low-grade mineralization or alteration halos were overlooked.

Next steps will include receipt of assay results in January 2026 for five additional holes testing lateral and depth extensions, integration of EM and complete core assay data into the resource model, compilation and characterization of alteration systems, and planning of a field exploration program. Phase 2 drilling will be planned following compilation of Phase 1 drilling, geophysical data, and results from the upcoming field campaign.

Table 1: First Two Holes of Phase 1 Drilling Campaign at Berrigan Mine Project

Hole ID

From (m)

To

(m)

Length (m)

ZnEq

(%)

AuEq (g/t)

Au

(g/t)

Ag

(g/t)

Cu (ppm)

Zn

(ppm)

TOM-25-009

156.70

204.75

48.05

6.68

1.57

1.12

7.55

365

13977

Including

156.70

159.60

2.90

39.03

9.15

6.76

40.24

1897

75694

Including

163.95

169.00

5.05

3.85

0.90

0.41

11.35

285

14295

Including

181.70

182.90

1.20

14.06

3.29

2.36

19.50

346

28900

Including

189.20

194.60

5.40

21.86

5.12

3.75

16.35

754

48142

Including

196.00

198.60

2.60

2.40

0.57

0.43

5.28

565

1116

Including

204.00

204.70

0.70

43.65

10.25

8.71

9.20

478

60100

230.35

236.80

6.45

1.36

0.32

0.14

1.23

152

6699

Including

235.70

236.80

1.10

5.61

1.31

0.72

2.80

373

22700

244.50

259.70

15.20

5.44

1.27

0.59

7.22

440

24026

Including

254.60

257.15

2.55

25.15

5.85

2.24

32.07

1472

134216

TOM-25-010

108.00

111.00

3.00

2.54

0.60

0.51

1.53

232

2310

120.65

125.00

4.35

8.93

2.08

0.95

9.11

482

42663

Including

121.95

125.00

3.05

9.18

2.14

0.84

10.56

578

48566

130.70

179.00

48.30

2.67

0.62

0.30

4.11

385

10557

Including

135.75

142.00

6.25

12.87

3.00

1.63

16.13

928

47881

Including

144.80

149.00

4.20

2.21

0.51

0.12

4.68

366

13073

Including

158.30

159.35

1.05

4.05

0.94

0.16

5.93

974

27300

Including

175.50

177.70

2.20

4.71

1.10

0.79

3.57

393

10377

Notes:

  • The reported widths represent core lengths. ZnEq and AuEq are calculated using the Company’s standard parameters. True width is estimated to be approximately 80–85% of the core length, depending on the deviation angles.
  • AuEq calculation was based on US$4150/oz Au, $51.36/oz Ag, US$5.044/lb Cu and $1.398/lb Zn. AuEq = Au g/t + (Ag g/t × 0.01237) + (Cu ppm × 0.000083) + (Zn ppm × 0.000023). The use of AuEq is to calculate cut-off grades for exploration purposes, and no adjustments were made for metal recovery.
  • ZnEq calculation was based on US$4047/oz Au, $50.22/oz Ag, US$4.796/lb Cu and $1.390/lb Zn. ZnEq = Zn ppm + (Ag g/t × 527) + (Au g/t x 42466) + (Cu ppm × 3.45) / 10,000. The use of ZnEq is to calculate cut-off grades for exploration purposes, and no adjustments were made for metal recovery.

Table 2: Berrigan Mine Drill Hole Collars

Hold ID

Azimuth

Dip

Length

UTM – East

UTM – North

Elevation

TOM-25-009

129.70

-55.40

276.00

542370.00

5532596.00

395

TOM-25-010

130.01

-55.05

252.00

542419.00

5532647.00

392

Note: Assay results are pending for TOM-25-011 to TOM-25-015.

About the Berrigan Mine Project

The Berrigan Mine property consists of 16 claims totalling 483 hectares located 4 km north-northwest of the town of Chibougamau. TomaGold has an option to acquire 100% of the property from Chibougamau Independent Mines Inc.

The property has been the subject of more than one historical estimate. Met-Chem Canada Inc. prepared the most recent of these in April 2001 in a report titled: “Pre-feasibility study: Etude Conceptuelle, Projects Berrigan and Tortigny” by Chuinard et al. In the report, a resource estimate completed using polygonal estimation techniques stated 1,388,915 tonnes of material grading 3.17% Zn and 1.77 g/t Au on the main Berrigan Mine zone. No resource classifications were given for the resource (GM61359).

The mineral resource estimate presented above is historical in nature and was not prepared in accordance with National Instrument 43-101 standards. Accordingly, the reader is cautioned not to rely on this estimate, in whole or in part, as a current mineral resource. Substantial data compilation, verification, and, potentially, additional drilling and resampling would be required by a qualified person before the historical estimate could be classified as a current mineral resource. There can be no assurance that any portion of the historical mineral resource will ultimately be confirmed or demonstrated to be economically viable. For further information regarding the Berrigan Mine Project, please consult the press release dated September 13, 2023.

Technical Disclosure

The drilling program was managed by Explo-Logik of Val-d’Or, Québec. Drill core was split in half, with one half submitted to AGAT Laboratories at Val-d’Or for analysis. Gold was analyzed by fire assay (50 g) with atomic absorption finish, while base metals were analyzed by four-acid digestion with ICP-OES finish. Samples with gold grades greater than 10 g/t are reprocessed using metallic screening with a 106 µm cutoff. The processed material is split and analyzed by fire assay with ICP-OES finish to extinction. A separate split is prepared to independently analyze mineralized intervals with a target grade greater than 1.00% Cu-Zn using a Na₂O₂ fusion with ICP-OES or ICP-MS finish. Sample preparation duplicates, certified reference standards, and blanks are inserted into the sample stream.

The technical content of this press release has been reviewed and approved by Jean Lafleur, P.Geo., Vice President of Exploration of the Company, and Suzie Tremblay, P.Geo., Vice President of Operations at Explo-Logik Inc. and a consultant to TomaGold, each acting as a Qualified Person under National Instrument 43-101.

About TomaGold

TomaGold Corp. (TSXV: LOT, OTCPK: TOGOF) is a Canadian junior mining company focused on the acquisition, exploration, and development of high-potential precious and base metal projects, with a primary focus on gold and copper in Québec and Ontario. The Company’s core assets are located in the Chibougamau Mining Camp in northern Québec, where it owns the Obalski gold-copper-silver project and holds options to acquire 12 additional properties, including the Berrigan Mine, Radar, David, and Dufault projects. TomaGold also holds a 24.5% joint venture interest in the Baird gold property near the Red Lake Mining Camp in Ontario. In addition, the Company has lithium and rare earth element (REE) projects in the James Bay region, strategically positioned near significant recent discoveries.

Cautionary Statement on Forward-Looking Information

This news release includes certain statements that may be deemed “forward-looking statements”. All statements in this news release, other than statements of historical facts, that address events or developments that the Company expects to occur, are forward-looking statements. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words “expects”, “plans”, “anticipates”, “believes”, “intends”, “estimates”, “projects”, “potential” and similar expressions, or that events or conditions “will”, “would”, “may”, “could” or “should” occur. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ materially from those in the forward-looking statements. Factors that could cause the actual results to differ materially from those in forward-looking statements include the potential results of exploration and drilling activities, market prices, continued availability of capital and financing, and general economic, market or business conditions. Investors are cautioned that any such statements are not guarantees of future performance and actual results or developments may differ materially from those projected in the forward-looking statements. Forward-looking statements are based on the beliefs, estimates and opinions of the Company’s management on the date the statements are made. Except as required by applicable securities laws, the Company undertakes no obligation to update these forward-looking statements in the event that management’s beliefs, estimates, opinions, or other factors should change.

Neither TSX Venture Exchange nor its Regulations Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

Contacts

David Grondin
President and Chief Executive Officer
(514) 583-3490
www.tomagoldcorp.com

Source

This post appeared first on investingnews.com
Previous Post

Best Crypto To Buy Now 22 December – XRP, SOL, ETH

Next Post

Ghana Just Legalized Crypto Trading – Here’s the Catch

Next Post
Ghana Just Legalized Crypto Trading – Here’s the Catch

Ghana Just Legalized Crypto Trading – Here’s the Catch

  • Trending
  • Comments
  • Latest
Buy Bitcoin Under $100K Before The Next Bull Run

Buy Bitcoin Under $100K Before The Next Bull Run

April 22, 2025
Zeldin, McCain hammer Crockett on Epstein donations claim

Zeldin, McCain hammer Crockett on Epstein donations claim

November 20, 2025
Best Altcoin Coin to Buy During the Crypto Crash – 21 November

Best Altcoin Coin to Buy During the Crypto Crash – 21 November

November 22, 2025
Target is eliminating 1,800 corporate jobs as it looks to reclaim its lost luster

Target is eliminating 1,800 corporate jobs as it looks to reclaim its lost luster

October 24, 2025
Monero Price Prediction: Can XMR Reach $500 In 2025 – 146% Gains YoY Make It Possible

Monero Price Prediction: Can XMR Reach $500 In 2025 – 146% Gains YoY Make It Possible

0
Quantum Computing: its Evolution and its Potential Future

Quantum Computing: its Evolution and its Potential Future

0
Quantum Computing: its Evolution and its Potential Future

Quantum Computing: its Evolution and its Potential Future

0
Air Direct Capture – Reducing CO2 from the Atmosphere

Air Direct Capture – Reducing CO2 from the Atmosphere

0
Monero Price Prediction: Can XMR Reach $500 In 2025 – 146% Gains YoY Make It Possible

Monero Price Prediction: Can XMR Reach $500 In 2025 – 146% Gains YoY Make It Possible

December 22, 2025
EXCLUSIVE: OIG report shows major turnaround in Social Security Administration’s phone service under Trump

EXCLUSIVE: OIG report shows major turnaround in Social Security Administration’s phone service under Trump

December 22, 2025
China quietly loads 100+ ICBMs into new missile silos near Mongolia: report

China quietly loads 100+ ICBMs into new missile silos near Mongolia: report

December 22, 2025
Bitcoin Price Prediction: $88K Standoff as Coinbase, Metaplanet, and Ghana Shift the Game

Bitcoin Price Prediction: $88K Standoff as Coinbase, Metaplanet, and Ghana Shift the Game

December 22, 2025

    Stay updated with the latest news, exclusive offers, and special promotions. Sign up now and be the first to know! As a member, you'll receive curated content, insider tips, and invitations to exclusive events. Don't miss out on being part of something special.


    By opting in you agree to receive emails from us and our affiliates. Your information is secure and your privacy is protected.

    Recent News

    Monero Price Prediction: Can XMR Reach $500 In 2025 – 146% Gains YoY Make It Possible

    Monero Price Prediction: Can XMR Reach $500 In 2025 – 146% Gains YoY Make It Possible

    December 22, 2025
    EXCLUSIVE: OIG report shows major turnaround in Social Security Administration’s phone service under Trump

    EXCLUSIVE: OIG report shows major turnaround in Social Security Administration’s phone service under Trump

    December 22, 2025
    China quietly loads 100+ ICBMs into new missile silos near Mongolia: report

    China quietly loads 100+ ICBMs into new missile silos near Mongolia: report

    December 22, 2025
    Bitcoin Price Prediction: $88K Standoff as Coinbase, Metaplanet, and Ghana Shift the Game

    Bitcoin Price Prediction: $88K Standoff as Coinbase, Metaplanet, and Ghana Shift the Game

    December 22, 2025
    • About us
    • Contact us
    • Privacy Policy
    • Terms & Conditions

    Copyright © 2025 tradehavenhub.com | All Rights Reserved

    No Result
    View All Result
    • Investment Tips
    • Trade Tips
    • Crypto News
    • Economy News
    • Stock Market

    Copyright © 2025 tradehavenhub.com | All Rights Reserved